Dear Amit,
In this report actual working hr will be taking from work center capacity.In this report end user will enter breakdown time manually.As per break down time actual hr will be calculated.
For example:
Work center capacity is 11.20hr.This is the shift available hr also.
If we enter machine down time 2hr,then actual hr will be calculated as 9.20hr..If machine runs only 3hr for making product A.
If we enter machine down time as 0hr then actual hr will be calculated as 11.20hr.If machine runs only 1hr for making product B.
If we enter machine down time as 1hr then actual hr will be calculated as 10.20hr.If machine runs only 4.20hr for making product C.
So that we are getting wrong calculation.So we need as explained below
If we enter machine down time for A product as 2 hr then actual hr should be 3hr
if we enter machine down time for B product as 0hr then actual hr should be 1hr
If we enter machine down time for c product as 1hr then actual hr should be 4.20hr
So this is the scenario of the report.
Regards
Narendra